top of page
Castle Boulevard Phase 2
Groundworks and infrastructure works on constrained site.

Acute Civil Engineering delivered a comprehensive groundworks and civil engineering package at Castle Boulevard Phase 2 in Nottingham. The constrained urban site presented logistical challenges due to its proximity to a canal and an active cycle route.
The works included construction of ground beams and pile caps, installation of foul and storm drainage systems, precast ground floor planks, incoming utility services and Section 278 highway entrance works.

bottom of page









